News Flash

Home - News Flash

Posted on: June 28, 2019

Farrand St and Ward St Closed Monday to Through Traffic as Parking Garage Construction Progresses

BLOOMFIELD, NJ -- The construction of the second Bloomfield Parking Garage which began in April is will continue on Monday, July 1. Through traffic will be closed to Washington Street between Lackawanna Pl. and Farrand St. and closed to Ward St. Left turns from Ward St. onto Farrand St. will not be permitted during the day.

The Township has rented LED Flashing Signage boards to notify traffic that Farrand St. will be closed on Monday. The signs have been posted the no through traffic streets. An updated map with closure information will be posted on the township municipal website, and the Township mobile app.

The project, Lackawanna Station, will bring 174 new residential units and a new parking garage which will create 314 total parking spaces, of which the township will have access to over 200 shared spaces.

The Bloomfield Police Department, which oversees parking and traffic updates in town, has met with the developer and construction company several times and made routes adjustments so as to minimize inconvenience to pedestrians and accommodate local delivers to businesses.

Facebook Twitter Email

Other News in Home - News Flash

BFD 2

No Injuries at Washington St. Blaze

Posted on: January 22, 2020
Backpacks for Life-page-001

Backpacks for Life

Posted on: August 8, 2019
download

Planning and Zoning Board Meetings

Posted on: July 23, 2019
screenings Flyers_Page_1

Health Screenings & Literacy

Posted on: June 24, 2019
Bloomfield-Road-Ratings-May-2019-page-001

Road Rating System

Posted on: June 19, 2019
theft from auto flyer-page-001

Tips to Prevent Theft from Vehicles

Posted on: June 12, 2019
Veggie Truck Flyer - 6-12

Veggie Truck Events

Posted on: June 10, 2019
bloomfield youth band june 8 concert flyer

FAREWELL FOR THE SUMMER

Posted on: May 16, 2019